Drawn from the contract set, not around it
Every dimension traces back to a sheet and a detail in the permit set. Where the contract documents conflict with each other — and on a renovation they usually do — the conflict is raised as an RFI before fabrication rather than discovered on site, which is the difference between a two-day answer and a two-week remake.
Formatted for the approval stamp
Submittal-ready packages: title block, revision cloud and delta, submittal number, and a transmittal listing what changed since the last round. Reviewers reject packages for missing information far more often than for wrong geometry, so the paperwork is treated as part of the drawing.
Trades we draw for
Structural and miscellaneous steel, architectural millwork and casework, storefront and curtain wall, stairs and railings, and mechanical ductwork and piping. Field measurements are taken as-built before the first line is drawn on anything that meets existing construction.